Elkins Railroad BridgeWeek of May 1-4, 2007 |
|
|---|---|
|
On May 2, the bridge is covered with rails and Track 2 is underway.
On May 3, the switch that will lead to the museum is being installed and Track 2 is still underway.
|
Bridge UpdatesMarch 24, 2006
Depot Updates |
|
|